SIEMENS MM8000 is superseded with SIWENOID v2 management system. 18 pcs of SINTESO control units are interconnected in two native loop (SafeDlink). The SIWENOID communicates on two path with the SafeDlink net.

The system consist of 3 client workstation. One at the fire department, one at the maintenance brigade and one at central dispacher room.

Event operation and intervention is assisted by maps and a text based instructions. Engineers can do their daily maintenance and configuration without any interuption or restart of the system. SIWENOID is always watching and guarding.